Napanee River Bridge

The Ontario Ministry of Transportation completed a Group ‘B’ Class EA and Preliminary Design Study in 2019 to undertake improvements to the Highway 401 interchange at Palace Road (GWP 4197-13-00), located within the current Study #2 study area. The process was documented in the Highway 401 Interchange Improvements at Palace Road Class Environmental Assessment and Preliminary Design Study Transportation Environmental Study Report (March 2019).

As part of the current Study #2, the previously approved Palace Road Interchange Technically Preferred Plan (as illustrated) was revisited to assess compatibility with an interim and ultimate footprint of Highway 401, as well as accommodation of a potential 130 km/h design speed of Highway 401. Based on this review, no significant modifications to the previously approved configuration are recommended.

Highway 401 / Palace Road Interchange Technically Preferred Plan (2019)

Highway 401 / Napanee River Bridge Improvements Preliminary Design and Class Environmental Assessment

As the Palace Road Interchange Technically Preferred Plan advances to Detail Design, advancement of the Napanee River Bridge (Site 17X-0062/B0) from the current Study #2 project is required due to its proximity to Palace Road and thus, has been added to the scope of work as a separate Class EA and Preliminary Design study (WP 4039-19-01).  Standalone environmental reports and a Transportation Environmental Study Report (TESR) have been prepared for the bridge’s Preliminary Design. These are being prioritized ahead of the remaining Study #2 works.

The Napanee River Bridge TESR is available for a 30-day comment period from October 29, 2026, to November 30, 2026, and is available at the link below and/or in-person at the following locations:

Concrete bridge spanning a shallow river, showing multiple support arches and vegetation along the riverbank.

County of Lennox & Addington Public Library
25 River Road
Napanee, ON K7R 3S6
Monday to Thursday: 10 a.m. to 8 p.m. Friday: 10 a.m. to 5 p.m. Saturday: 10 a.m. to 5 p.m.

Town of Greater Napanee – Town Hall
99 Advance Avenue
Napanee, Ontario K7R 3Y5
Monday to Friday: 9 a.m. to 4 p.m.

You are encouraged to participate in the Project and to please provide comments in writing to the Project Team. To obtain additional information or provide comments, please visit the project website at Hwy401BellevilletoKingston.ca or contact one of the Project Team members as follows:

Tim Sorochinsky, P.Eng. AECOM Project Manager
AECOM Canada ULC
105 Commerce Valley Drive West 8th Floor
Markham, Ontario L3T 7W3

Lucas Bilow, P.Eng. MTO Lead Engineer
Ministry of Transportation, Eastern Region Engineering Program Delivery East
1355 John Counter Boulevard
Kingston, Ontario K7L 5A3

Toll-Free Telephone Number: 1-866-753-2640
Email: ProjectTeam@Hwy401BellevilletoKingston.ca

Key Project Milestones and Timelines for the Highway 401 / Napanee River Bridge Improvements Class EA and Preliminary Design Study
(WP 4039‑19‑01)

Spring 2026

Supplementary Investigations by Environmental and Drainage Teams

Summer / Fall 2026

Draft / Final Environmental Specialist Studies & Technical Reports

Fall 2026

Finalize TESR and Issue Notice of Completion with 30-day comment period

Fall 2026

Recommended Plan

Sign-up for our mailing list

We want to hear from you! Your input is important to us. To be added to the Project Mailing List, please enter your email to sign-up for our mailing list. To send your comments to the Project Team please visit the Contact Us section of this website.

Please enter a valid email address.
Something went wrong. Please check your entries and try again.