Highway 401 Improvements Between City of Belleville and City of Kingston

Planning, Preliminary Design and Class Environmental Assessment
Study #1 (GWP 4022-21-00) and Study #2 (GWP 4016-21-00)
Ontario Ministry of Transportation

About the Project

The Ontario Ministry of Transportation (MTO) has retained AECOM Canada Limited to undertake two Planning, Preliminary Design and Class Environmental Assessment (Class EA) studies to address current and future transportation needs by developing a plan for the rehabilitation and/or replacement of various bridges and culverts, determining the long-term interchange configuration at seven locations, and establishing the footprint for the interim six and ultimate eight lanes of Highway 401, between the City of Belleville and the City of Kingston.

Study #1

Includes Highway 401 from 4.3 km east of Highway 37 to 5 km west of County Road 41 / Centre Street for a total length of approximately 26 km.

Study #2

Includes Highway 401 from 5 km west of County Road 41 / Centre Street to 8 km west of Kingston Road 38 for a total length of approximately 29 km.

The details of the work proposed will be further developed as the Preliminary Design progresses and will be presented to the public and agencies at two Public Information Centres planned for each study.

Sign-up for our mailing list

We want to hear from you! Your input is important to us. To be added to the Project Mailing List, please enter your email to sign-up for our mailing list. To send your comments to the Project Team please visit the Contact Us section of this website.

Please enter a valid email address.
Something went wrong. Please check your entries and try again.
Skip to content